
Add to Cart
10 Years Experience ISO Standard Hospital Modular Cleaning Room Warranty 2 Years
Technical Requirements For Different Air-cleaning Area
Name | Grade of Air cleaning | Air changes (times/h) | Self-cleaning time(min) | Temperature (℃) | Humidity (%) | Mininum Fresh air | Noise dB(A) | Minimum illumination (lx) | |
(m3/h·person) | (Times/h) | ||||||||
Special OT and Lab | 100 | - | ≤15 | 22-25 | 40-60 | 60 | 6 | ≤52 | ≥350 |
Standard OT | 1,000 | 30-36 | ≤25 | 22-25 | 40-60 | 60 | 6 | ≤50 | ≥350 |
Normal OT | 10,000 | 18-22 | ≤30 | 22-25 | 35-60 | 60 | 4 | ≤50 | ≥350 |
Primary OT | 100,000 | 12-15 | ≤40 | 22-25 | 35-60 | 60 | 4 | ≤50 | ≥350 |
Perfusion preparation room | 1,000 | 17-20 | - | 21-27 | ≤60 | none | 3 | ≤60 | ≥150 |
Storage room | 10,000 | 10-13 | 21-27 | ≤60 | 3 | ≤60 | ≥150 | ||
Nurse Station | 10,000 | 10-13 | 21-27 | ≤60 | 60 | 3 | ≤60 | ≥150 | |
Prepare Room (disinfection) | 10,000 | 10-13 | 21-27 | ≤60 | 30 | 3 | ≤60 | ≥200 | |
Pre-anesthesia room | 10,000 | 10-13 | 22-25 | 30-60 | 60 | 4 | ≤55 | ≥150 | |
Washing basin room | 10,000 | 10-13 | 21-27 | ≤65 | - | 3 | ≤55 | ≥150 | |
Cleaning corridor | 100,000 | 10-13 | 21-27 | ≤65 | 3 | ≤52 | ≥150 | ||
Change cloth | 100,000 | 8-10 | 21-27 | 30-60 | 3 | ≤60 | ≥200 | ||
Recovery room | 100,000 | 8-10 | 22-25 | 30-60 | 4 | ≤50 | ≥200 | ||
Normal corridor | 300,000 | 8-10 | 21-27 | ≤65 | 3 | ≤55 | ≥150 |
Types Of Modular OT
G-series:
E-series:
C-series:
A-series:
Wall And Ceiling Plate For Corridor
PVC Flooring and Rubber Flooring
![]() | ![]() |
PVC floor in corridor and secondary room | PVC and Rubber floor in OT |
About us
Kingbell International Technology Development Co., Ltd. is a professional high-tech enterprise specialized in clean operation room system and central gas supply system. We register in Hong Kong and with factory in Hua Xin town of shanghai, China.
We are focused on construction of clean OTs, clean industrial plants (pharmaceutical factory, food factories, electronics factory, cosmetics factory etc.) and clean laboratories. We have professional teams including designing, budgeting, constructing, commissioning and testing, which can ensure the quality of projects. And our team members have participated in more than 100 hospital and clean workshop projects, has accumulated rich experience in this field.
Our services